FACILITIES ORCHESTRATION · MAXINST CFM3D
Your building's floor plan, alive on the screen that decides where every maintenance dollar goes.
Asset and facilities management with a navigable 3D floor plan, maintenance cost tracked by work order, and a 35-to-45-business-day rollout with the Maxinst EAM Quickstart methodology.

2D/3D navigation is available once your organization already has a floor plan or BIM model (IFC) to integrate.
You only find out where the maintenance budget went at quarter close.
Floor plans scattered across PDFs, spreadsheets and the memory of whoever's been there longest. Work orders with no part, labor or contract cost attached. An audit turns into a side project, not a two-click report.
That's not an operational detail. It's a continuity risk.
How CFM3D solves it
- 01
You don't know where the maintenance budget is going
Labor, part and contract cost captured automatically by work order
- 02
You waste time finding the right floor plan
Native navigable 2D/3D floor plan, once you already have the drawing or BIM model (IFC) to integrate into the platform
- 03
EAM rollout is long and risky
Maxinst EAM Quickstart methodology, with a formal acceptance criterion at every phase
- 04
New team members take too long to become productive
Mobile-first interface; a new technician is productive in days
- 05
Audits are a nightmare
GEFMA 444 and ISO 19650 certifications built into the platform
HOW IT WORKS
One system. Four layers. One single continuity.
Select a layer
Native 3D, no separate viewer
If you already have a 2D/3D floor plan or a BIM model (IFC format), it goes straight into the system — no separate visualization software required.
Cost visible by work order
Every ticket already carries labor, parts and contract cost. Quarter close becomes a report, not an investigation.
Rollout with a fixed timeline
35 to 45 business days to go live, with a formal acceptance criterion at every phase. Not "a few months, on average".
PROOF AND AUTHORITY
Continuity isn't promised. It's sustained.
CFM3D is a new Maxinst offer: a certified kernel, a rollout methodology with a closed acceptance criterion phase by phase, and ongoing support, packaged specifically for whoever looks after facilities. The confidence comes from the rigor of the kernel and the methodology, not from a case study still to come.
MAXINST ORCHESTRATES

Octave Attune (EAM/APM) as the CFM3D kernel, and Axis Communications for computer vision via ACAP.
20+ years in the market
Methodology aligned with ISO 55000/55001/55002.
GEFMA 444
Octave Attune Facilities · March 2025
ISO 19650
Octave Attune Facilities · July 2025, LRQA
WHO IT'S FOR
Whoever looks after a portfolio that can't stop.
- 01
Higher education
Multiple campuses, historic and modern buildings side by side, ESG reporting pressure.
- 02
Commercial real estate
Multi-site portfolios, often with outsourced FM where data ownership is a real issue.
- 03
Healthcare
Regulated environment, zero tolerance for missed preventive maintenance.
- 04
Government
Large, aging portfolio, tight audit and budget cycle.
- 05
Shopping malls
Seven-day-a-week operation, common areas and tenants sharing systems, maintenance done outside public hours.
- 06
Data centers
Critical power and cooling infrastructure, strict availability SLA, minimal maintenance window.
FREQUENTLY ASKED QUESTIONS
What people usually ask us.
“We don't have a BIM model for our facilities.”
It's not required. CFM3D works even without a drawing or BIM model. If you already have a 2D/3D floor plan or a BIM model (IFC), we integrate it directly into the platform.
“We're locked into a contract with our current FM provider.”
CFM3D doesn't require switching providers. Your organization becomes the owner of the performance history, regardless of who operates day to day.
“Our team won't adopt yet another system.”
The interface is mobile-first. A new technician is productive in days, with the floor plan, history and the right part already at the point of work.
“EAM rollouts always take forever.”
The Maxinst EAM Quickstart methodology delivers in 35 to 45 business days, with a closed acceptance criterion phase by phase, not a loose estimate.
Another question? Bring it to the diagnostic.
Diagnostic. Orchestration. Sustainment.
Maxinst diagnoses the operation before recommending any technology, orchestrates CFM3D within the Quickstart's fixed timeline, and stays close for sustainment, if that's your case.
- 01
Diagnostic of the operation before any recommendation.
- 02
Orchestration of CFM3D within the Quickstart's fixed timeline.
- 03
Sustainment close by after go-live, if that's your case.
Continuity isn't luck. It's orchestration.
Schedule a diagnostic of your operation
A Maxinst specialist will get back to you to set up the conversation.
